The design and supervision over the construction of a new Tulip Supermarket branch verlengde Gemenelandsweg.The building consists of 2 floors each approx. 60×67.5m and scope of works includes parking area, utility building. The project was scheduled for the period 2022-2025, but is now in its final stages.

